1. Stair carpet was removed and the boards were replaced. The stairs squeaked badly. There was no way to walk quietly up or downstairs. Each board (step) was removed and replaced to eliminate squeak!
2.Carpet was removed from the hallway, Joslyn's room and Master bedroom
3. Jake prepared the outside of the house where the new window was going in for the stucco guy to come and repair.
Those are doors that were standing against the framing to cover the hole.
4. The window was finally put in....the hole is gone!
The inside view of the new window.
5. The window was trimmed out and a window sill was added.
6. New 4-1/4 in. baseboard was added throughout the house (We got it for $0.50 a square foot! Awesome deal!
7. The doors were all replaced and new trim was added to frame them in. I love paneled doors.
8. The kitchen didn't need remodeling thank goodness. It's gorgeous! But, one part of the countertop was coming up so liquid nail was used with this board method to keep it tight for a few days. Hopefully it will stay!